DrainClearanceInBakerStreet-2014-07-10-SDC11014

Last week TfB fixed 219 potholes and continued with the fifth verge cut of the season, the complete programme will finish during October 2014.

In addition 764 drains were cleared and TfB continued with our routine programme of minor works including sign cleaning, kerb fixing and railing and bollard maintenance.

The TfB footway treatment programme continues next week with the following locations receiving attention :

Friday 29th August 2014 – Wednesday 10th September 2014 : Broughton Avenue, Aylesbury
These are preparation works in advance of a slurry treatment being applied to the footway

Monday 8th September 2014 – Wednesday 10th September 2014 : Treachers Close, Chesham
These are preparation works in advance of a slurry treatment being applied to the footway

Monday 8th September 2014 – Thursday 11th September 2014 : Page Hill Avenue, Buckingham
These are slurry works to the footway

Monday 8th September 2014 – Tuesday 16th September 2014 : Burkes Road, Beaconsfield
These are preparation works in advance of a slurry treatment being applied to the footway

Wednesday 10th September 2014 – Thursday 11th September 2014 : Packhorse Road, Gerrards Cross
These are preparation works in advance of a slurry treatment being applied to the footway

Friday 12th September 2014 – Thursday 18th September 2014 : Geralds Road, Totteridge
These are preparation works in advance of a slurry treatment being applied to the footway

Thursday 11th September 2014 – Monday 15th September 2014 : Bates Lane, Weston Turville
These are slurry works to the footway

Severe weather recovery work is planned to take place at the following locations :

Tuesday 2nd September 2014 – Monday 8th September 2014 : Marroway, Weston Turville
These will be daytime works carried out utilising a combination of a road closure and temporary traffic lights

Monday 8th September 2014 – Tuesday 9th September 2014 : Calvert Road, East Claydon
These are daytime works carried out utilising a road closure

Monday 8th September 2014 – Friday 12th September 2014 : Nightingales Lane, Chalfont St Giles
These are daytime works being carried out utilising a road closure

Tuesday 9th September 2014 – Thursday 11th September 2014 : Upper Icknield Way, Aston Clinton
These will be daytime works carried out utilising temporary traffic lights

Wednesday 10th September 2014 – Thursday 11th September 2014 : Waddesdon Hill, Waddesdon
These will be daytime works carried out utilising a road closure

Friday 12th September 2014 – Monday 15th September 2014 : Puttenham Road, Drayton Beauchamp
These are daytime works carried out utilising a road closure

Friday 12th September 2014 – Friday 19th September 2014 : Berryfields, Quarrendon
These will be daytime works carried out utilising a road closure, with the possibility of traffic lights overnight on at least one occasion

Road treatment work planned in the following locations :

Underway – Friday 12th September 2014 : Churchill Avenue, Aylesbury
These are night time surfacing works being carried out utilising a road closure

Thursday 11th September 2014 : A418 Oxford Road, Aylesbury (Bus Lane)
These are night time surfacing works being carried out utilising a road closure

Thursday 11th September 2014 – Friday 12th September 2014 : Wiltshire Road, Marlow
These are daytime micro surfacing works being carried out utilising a road closure

Thursday 11th September 2014 – Friday 12th September 2014 : Main Street, Ashendon
These are daytime micro surfacing works being carried out utilising a road closure

Saturday 13th September 2014 – Sunday 14th September 2014 : Martinsend Lane, Great Missenden
These are daytime micro surfacing works being carried out utilising a road closure

Saturday 13th September 2014 : Station Road, Stoke Mandeville
These are daytime micro surfacing works being carried out utilising a road closure

Sunday 14th September 2014 : Bicester Road, Long Crendon
These are daytime micro surfacing works being carried out utilising a road closure