Road surfacing works planned from 31st October 2014 to 6th November 2014

| October 31, 2014

DrainClearanceInBakerStreet-2014-07-10-SDC11014

In the past week Transport for Buckinghamshire (TfB) have completed the work on the A40, Abbey Way flyover in High Wycombe on schedule.

The TfB LED street light replacement programme continues on track.

TfB also attended to over 1260 potholes and their routine gully maintenance has visited 1813 gullies.

Road treatment works continue across the network, and the following roads have all received a visit from TfB :
A418 Wingbury Farm to Cottesloe Roundabout
Tring Road & Dark Lane, Wingrave
White Hill, Chesham

Footway works have been carried out at Station Road, Stoke Mandeville.

The TfB Severe Weather Recovery Scheme visited Crendon Road, Shabbington, Moor End, Edlesborough and Billet Lane, Iver.

Next week road treatment work will take place on the following roads :

A418 Wing (Cottesloe Roundabout – Wingbury Farm) : Friday 31st October 2014 : These are night time kerbing and road marking works being carried out utilising a road closure
White Hill, Chesham : Saturday 1st November 2014 : These are surfacing works to the layby being carried out utilising temporary traffic lights
Main Street, Grendon Underwood : Ongoing – Saturday 1st November 2014 : These are surfacing works being carried out utilising a 24 hour road closure
A4010 Wycombe Road, Saunderton : Monday 3rd November 2014 – Wednesday 5th November 2014 : These will be night time surfacing works carried out utilising a road closure
Church Road, Iver : Monday 3rd November 2014 – Thursday 6th November 2014 at 9.00am : These are surfacing works being carried out utilising a 24 hour road closure
Church Road, Iver : Thursday 6th November 2014 – Monday 17th November 2014 : These are night time surfacing works being carried out utilising a road closure
A416 Chesham Road, Amersham : Monday 3rd November 2014 – Thursday 6th November 2014 : These are night time surfacing works being carried out utilising a road closure
High Street/Stratford Road, Whaddon : Monday 3rd November 2014 – Friday 7th November 2014 : These are daytime surfacing works being carried out utilising a road closure
A418 Wingrave Crossroads : Thursday 6th November 2014 – Monday 10th November 2014 : These are night time surfacing works being carried out utilising a road closure
Woodside Road, Amersham : Friday 7th November 2014 – Thursday 13th November 2014 : These are night time surfacing works being carried out utilising a road closure

Footway work will visit the following areas :

Elizabeth Avenue, Little Chalfont : Ongoing – Friday 7th November 2014 : These are surfacing preparation works to the footway in advance of a slurry treatment
Chestnut Lane, Amersham/Chesham Bois : Ongoing – Thursday 13th November 2014 : These are surfacing preparation works to the footway in advance of a slurry treatment
Station Road, Cheddington : Ongoing – Friday 7th November 2014 : These are conventional surfacing works to the footway
Wellington Avenue, Princes Risborough : Ongoing – Tuesday 4th November 2014 : These are slurry surfacing works to the footway
Station Road, Stoke Mandeville (2nd visit) : Tuesday 4th November 2014 : These are slurry surfacing works to the footway
Bicester Road, Long Crendon (2nd visit) : Wednesday 5th November 2014 – Friday 7th November 2014 : These are slurry surfacing works to the footway
Castle Street, High Wycombe : Saturday 8th November 2014 – Sunday 9th November 2014 : These are slurry surfacing works to the footway
Geralds Road, Totteridge : Thursday 6th November 2014 – Tuesday 11th November 2014 : These are slurry surfacing works to the footway

The TfB Severe Weather Recovery Scheme will continue at :

Hollow Hill Lane, Iver : Ongoing – Monday 3rd November 2014 : These are daytime works being carried out utilising a road closure
Latimer Road, Chesham : Saturday 1st November 2014 : These are daytime remedial works being carried out utilising temporary traffic management
Nightingales Lane, Chalfont St Giles : Saturday 1st November 2014 : These are daytime remedial works being carried out utilising temporary traffic management
West End Road, Cheddington : Monday 3rd November 2014 : These are daytime remedial works being carried out utilising temporary traffic management
Bicester to Ludgershall Road, Ludgershall : Monday 3rd November 2014 : These are daytime works being carried out utilising basic traffic management
Ladysmith Road, Ivinghoe : Monday 3rd November 2014 : These are night time works being carried out utilising a road closure
Vicarage Lane, Ivinghoe : Tuesday 4th November 2014 : These are daytime drainage works being carried out utilising a road closure
Love Green Lane, Iver : Monday 3rd – Tuesday 4th November 2014 : These are daytime works being carried out utilising a road closure
Spring Lane, Flackwell Heath : Tuesday 4th November 2014 – Wednesday 5th November 2014 : These are daytime works being carried out utilising a road closure
Chapman Lane, Flackwell Heath : Thursday 6th November 2014 – Friday 7th November 2014 : These are daytime works being carried out utilising temporary traffic lights

Comments are closed.