This week the Transport for Buckinghamshire (TfB) Christmas embargo came into force, as a result work on the main roads has been reduced.
Reactive maintenance work has continued with potholes still being filled and larger scale work has continued on more minor roads. The TfB Severe Weather Recovery Scheme is now complete.
The patching programme started this week. The following sites have received a visit using the DfT grant money for fixing potholes :
Turville Valley Road Turville
Swallow Street Iver
Lower Road Gerrards Cross
Mill Lane Gerrards Cross
Howard Avenue Aylesbury
The Green & Brook Street Edlesborough
Chiltern Road Ballinger
Horton Road Ivinghoe
Resurfacing work has been completed in the following locations:
Hampden Road, Hampden
Wood Lane, Iver
And footway repairs have been carried out at the sites listed below:
Elizabeth Avenue, Little Chalfont
Packhorse Road, Gerrards Cross
Lent Rise Road, Burnham
Rowliff Road, High Wycombe
In the coming week TfB maintenance programmes continue on minor roads due to the Christmas embargo.
Pound Lane, Marlow : Ongoing – Monday 15th December 2014
These are daytime surfacing works being carried out utilising a road closure
Stewarts Drive, Farnham Common : Monday 15th December 2014 – Thursday 18th December 2014
These are daytime surfacing works being carried out utilising a road closure
Burlington Road Burnham : Monday 15th December 2014 – Tuesday 16th December
These are daytime patching works being carried out utilising a road closure
Marsham Lane Gerrards Cross : Monday 15th December 2014
These are daytime patching works being carried out utilising a road closure
Marsworth Road Pitstone : Monday 15th December 2014
These are daytime patching works being carried out utilising an off peak road closure
Cheddington Road Pitstone : Tuesday 16th December 2014 – Wednesday 17th December 2014
These are daytime patching works being carried out utilising a road closure.
Hollybush Lane Denham : Tuesday 16th December – Wednesday 17th December 2014
These are daytime patching works being carried out utilising a road closure
Taplow Common Road Burnham : Wednesday 17th December 2014 – Thursday 18th December 2014
These are daytime patching works being carried out utilising an off peak road closure
Green Common Lane Beaconsfield : Thursday 18th December 2014 – Friday 19th December 2014
These are daytime patching works being carried out utilising a road closure
Beacon Road Ringshall : Thursday 18th December 2014 – Friday 19th December 2014
These are daytime patching works being carried out utilising a road closure
Grove Road Burnham : Friday 19th December 2014
These are daytime patching works being carried out utilising a road closure
And footway works also continue:
Church Road, Iver : Ongoing – Wednesday 10th December
These are slurry surfacing works to the footway
Fassets Road, Loudwater : Ongoing – Saturday 13th December
These are preparation works to the footway in advance of slurry sealing
Tubwell Road Estate, Wexham Street : Ongoing – Saturday 20th December
These are preparation works to the footway in advance of slurry sealing
Fowler Road, Aylesbury (visit 1) : Ongoing – Friday 19th December
These are conventional surfacing works to the footway
Lent Rise Road, Burnham : Saturday 13th December – Sunday 14th December
These are slurry surfacing works to the footway
Eastwood Road, Stokenchurch : Monday 15th December – Tuesday 16th December
These are slurry surfacing works to the footway
Kingsway, Chalfont St Giles : Monday 15th December – Saturday 20th December
These are preparation works to the footway in advance of slurry sealing
After these works, the TfB programmes shut down for two weeks until the 5th January 2015.
Anyone needing to report a road defect, you can still do so in the usual way – call the TfB contact centre on 01296 382416, or if you do not think it requires urgent attention you can log it on-line at www.buckscc.gov.uk/telltfb.