Week commencing Monday 27th June 2022 Transport for Buckinghamshire will be carrying out work at the following locations.

The works are part of a rolling programme. As some activities are weather dependent the dates may change at short notice.

Surface Dressing Programme

Frieth Road, Frieth – From Moor Common to Chalkpit Lane (Bovingdon Green) : Monday 20th June 2022 to Thursday 7th July 2022 – Surface dressing patching works using a road closure in operation Monday to Friday 8.00am to 5.00pm.

Uxbridge Road, Wexham – From Five Points Roundabout to Wexham Park Lane : Wednesday 29th June 2022 to Thursday 30th June 2022 – Surface dressing patching works using a road closure in operation Monday to Friday 8.00am to 5.00pm.

Burton Lane, Little Chalfont – From Amersham Road Junction to Roughwood Lane / Lodge Junction : Friday 1st July 2022 to Wednesday 6th July 2022 – Surface dressing patching works using a road closure in operation Monday to Friday 8.00am to 5.00pm.

Footway Improvement Schemes

Harcourt Road, Dorney Reach – From Marsh Lane to Dorney Reach Road : Monday 23rd May to Friday 1st July 2022 – Footway improvement works using a footway give and take management system in operation Monday to Friday 8.00am to 5.00pm.

Cedar Avenue, High Wycombe – From Holmer Green Road to Brimmers Hill : Monday 20th June 2022 to Friday 22nd July 2022 – Footway improvement works using a footway give and take management system in operation Monday to Friday 8.00am to 5.00pm.

Street Lighting Schemes

Mill Meadow, Aylesbury – Outside No.2, No.4, No.14, No.21, No.72 : Monday 27th June 2022 to Thursday 30th June 2022 – Lamp column replacement works using give and take traffic management in operation Monday to Friday 8.00am to 5.00pm.

Shereway, Aylesbury – Outside No.10, No.11, No.14, No.19, No.20, No.22 and No.25. : Wednesday 29th June 2022 to Sunday 3rd July 2022 – Lamp column replacement works using give and take traffic management in operation Monday to Sunday 8.00am to 5.00pm.

Bridge Schemes

High Street, Marlow – Marlow Bridge : Tuesday 5th October 2021 to Tuesday 25th October 2022 – Major bridge refurbishment using a footway closure when appropriate in operation Monday to Friday between 8.00am and 5.00pm.

Highway Infrastructure Projects (HIPs)

A41 Bicester Road – Rabans Lane to Paradise Orchard including Jackson Road and Dickens Way, Aylesbury : Narrow Lane working on both north and southbound A41, with the inclusion of a temporary traffic light controlled, pedestrian crossing facility on the A41 south of Jackson Road. Both Jackson Road and Dickens Way will be shut to all vehicular traffic at the junction with the A41 to facilitate construction of road widening and road crossings for ducting and the construction of the pedestrian crossing facilities. The existing roundabout will be removed at the Jackson Road junction and the A41 will become a straight through road. Local diversions will be in place for both Jackson Road and Dickens Way. Bus services have been notified and are being diverted and temporary stops will be erected along the route. Advanced signage has been in place since Wednesday 1st June 2022 and a local letter drop has been completed to immediate residential and commercial properties. Working times will be 8.00am to 4.00pm Monday to Friday, sometimes later as work dictates, traffic management and road closures will be in place 24 / 7 up to Friday 15th July 2022.