Week commencing Monday 29th August 2022 roadworks are scheduled to take place at the following locations in Buckinghamshire.

The works are part of a rolling programme. As some activities are weather dependent the dates may change at short notice.

Plane and Patch Schemes

Church Street, Chesham – From A416 to Chessbury Road : Tuesday 30th August 2022 to Wednesday 31st August 2022 – Surface patching works using a road closure in operation Monday to Friday between 8.00am to 5.00pm.

Saxon Gardens, Taplow – Whole Length : Tuesday 30th August 2022 – Surface patching works using both a road closure and two-way temporary traffic lights in operation Monday to Friday 9.30am to 3.30pm.

Jennery Lane, Burnham – Whole Length : Wednesday 31st August 2022 – Surface patching works using both a road closure in operation Monday to Friday 9.30am to 3.30pm.

Hampden Close, Stoke Poges – Whole Length : Thursday 1st September 2022 – Surface patching works using both a road closure and two-way temporary traffic lights in operation Monday to Friday 9.30am to 3.30pm.

Village Road, Denham – Whole Length : Friday 2nd September 2022 – Surface patching works using both a road closure and two-way temporary traffic lights in operation Monday to Friday 9.30am to 3.30pm.

Community Board Schemes

High Street, Ivinghoe – From Vicarage Road to Station Road : Tuesday 30th August 2022 to Friday 2nd September 2022 – We will be undertaking several maintenance works including lining, bollard and sign installation and vegetation clearance. These works will be carried out using a road closure in operation Monday to Friday 9.00am to 4.00pm.

Microsurfacing Headline Works

Fromer Road, Wooburn Common – Entire Length : Tuesday 30th August 2022 – Microsurfacing headline treatment works and tree cutting preparation works using a road closure in operation Monday to Friday 7.30am to 5.00pm.

Ashenden Walk Farnham Common – Entire Length : Wednesday 31st August 2022 – Microsurfacing headline treatment works using a road closure in operation Monday to Friday 7.30am to 5.00pm.

Crispin Way, Farnham Common – Entire Length : Wednesday 31st August 2022 to Thursday 1 September 2022 – Microsurfacing headline treatment works using a road closure in operation Monday to Friday 7.30am to 5.00pm.

Mayflower Way, Farnham Common – Entire Length : Thursday 1st September 2022 to Friday 2 September 2022 – Microsurfacing headline treatment works using a road closure in operation Monday to Friday 7.30am to 5.00pm.

Hughenden Road, High Wycombe – Entire Length : Saturday 3rd September 2022 to Sunday 4 September 2022 – Microsurfacing headline treatment works using a road closure in operation Monday to Sunday 7.00am to 7.00pm.

Intelligent Traffic System Upgrade

Aylesbury Gyratory, Aylesbury – Stoke Road to Walton Street, Aylesbury : Tuesday 30th August 2022 to Saturday 3rd September 2022 – Preparation works for intelligent traffic system upgrade using a lane closure on Walton Street Monday to Saturday between 8.00am and 5.00pm. On Wednesday 31st August 2022 there will be a road closure on Stoke Road, Aylesbury overnight in operation between 7.00pm and 5.00am.

Microsurfacing Preparation Works

Black Park Road, Wexham – From Rowley Lane to A412 Uxbridge Road : Tuesday 30th August 2022 to Monday 5th September 2022 – Microsurfacing preparatory patching works using a road closure in operation Monday to Friday 9.30am to 4.30pm.

Footway Improvement Schemes

Gore Road, Burnham – Lent Rise Road to High Street : Monday 1st August 2022 to Friday 2nd September 2022 – Footway improvement works using two- and three-way lights at the junctions and a footway closure in operation Monday to Friday between 8.00am and 6.00pm.

Drainage Improvement Schemes

Hivings Hill, Chesham : Monday 4 July to Saturday 3rd September 2022 – Drainage improvement works using a combination of two-way and three-way temporary traffic lights in operation Monday to Friday between 7.00am until 5.00pm.

Network Safety Schemes

Hatters Lane, High Wycombe – From Wingate Avenue to Windrush Drive : Monday 8th August 2022 to Wednesday 7th September 2022 – Installation of a new signalised pedestrian crossing using two-way temporary traffic lights in operation Monday to Friday between 8.30am to 4.30pm. From Tuesday 30 August 2022, there will also be an overnight road closure in operation for approximately 4 nights between 7.00pm to 5.00am to install high friction surfacing.

Bridge Schemes

High Street, Marlow – Marlow Bridge : Tuesday 5th October 2021 to Friday 25th November 2022 – Major bridge refurbishment using a footway closure when appropriate in operation Monday to Friday between 8.00am and 5.00pm.

Highway Infrastructure Projects (HIPs)

A41 Bicester Road – Rabans Lane to Paradise Orchard including Jackson Road and Dickens Way, Aylesbury : On Tuesday 30th August 2022, there will be an overnight road closure of the A41 for approximately two nights. This will be in operation between 8.00pm and 6.00am to install new road markings and a new traffic island. Signed diversion routes will be in operation at this time. Work will continue on the Eastbound and Westbound near Jackson Road / Dickens Way junctions with narrow lanes while construction of two traffic islands and foot way works are undertaken. Works will be undertaken daytime and two-way traffic flow will be maintained at all times along the A41. From Monday 5th September 2022, a 24 / 7 lane closure will be in operation on the westbound approach to the Paradise Orchard / Sir Henry Lee Crescent Junction, to enable ditch realignment work to take place. The extent of the traffic management will be reduced in length at the junction end of the closure, to increase lane capacity during peak hours. This work is expected to be completed by the middle of October 2022. The reason for both Jackson Road and Dickens Way to remain closed is purely for safety reasons due to the change in configuration of the junction from a roundabout to a signal-controlled junction. The existing diversion routes for both Jackson Road and Dickens Way will remain in place until Friday 2nd September 2022.