Roadworks in Buckinghamshire for the week ahead – Monday 15th April 2024
Week commencing Monday 15th April 2024 roadworks are scheduled to take place at the following locations in Buckinghamshire.
The works are part of a rolling programme. As some activities are weather dependent the dates may change at short notice.
Plane and Patch Works
Bourton Road, Buckingham : Monday 15th April 2024 – Plane and patch surfacing works using a road closure. In operation between 9.30am and 3.00pm.
Queen Catherine Road, Steeple Claydon : Monday 15th April 2024 to Thursday 18th April 2024 – Plane and patch surfacing works using a road closure. In operation between 8.30am and 4.00pm.
Conventional Surfacing Works
Slough Road, Beaconsfield : Monday 15th April 2024 – Conventional resurfacing works using a road closure. In operation between 8.00pm and 6.00am.
Winslow Road, Swanbourne : Wednesday 10th April 2024 to Wednesday 17th April 2024 – Conventional resurfacing works using a road closure. In operation between 8.00pm and 6.00am.
Surface Dressing Preparation Works
Brays Lane, Hyde Heath : Wednesday 17th April 2024 to Thursday 18th April 2024 – Surface dressing patching works using a road closure. In operation between 9.30am and 3.30pm.
Ickford Road / Shabbington Road : Monday 15th April 2024 to Saturday 20th April 2024 – Surface dressing patching works using a road closure. In operation between 8.00pm and 6.00am.
Billets Lane, Iver : Monday 15th April 2024 to Tuesday 16th April 2024 – Surface dressing patching works using a road closure. In operation between 8.00pm and 6.00am.
Street Lighting Works
Buckinghamshire – Various Locations : Upgrade of LED lanterns.
Buckinghamshire – Various Locations : Upgrade of illuminated signs and bollards (located on central traffic islands and roundabouts).
Buckinghamshire – Various Locations : Upgrade of damaged street lighting columns and removal or damaged stumps.
Buckinghamshire – Belisha Beacons – Various Locations : Upgrade, improvement and re-instatement of beacons, lanterns and posts.
Buckinghamshire – School Wig Wag Units – Various Locations : Upgrade of existing flashing units to Bluetooth technology enabled and corrections / reinstatements to advanced warning signs.
Footway Works
Church Road, Penn : Monday 4th March 2024 to Friday 26th April 2024 – Footway resurfacing works using a footway closure and temporary traffic lights between 7.00am and 7.00pm.
Drainage Works
Bois Moor Road, Chesham Bois : Monday 4th March 2024 to Tuesday 23rd April 2024 – Drainage repair works using multi-way temporary traffic lights. In operation between 9.30am and 3.30pm.
Marlow Road, Cadmore End : Wednesday 27th March 2024 to Friday 19th April 2024 – Drainage repair works using 24 / 7 temporary traffic lights. In operation between 8.00am and 5.00pm.
The Green / Bovingdon Road, Botley : Monday 15th April 2024 to Friday 19th April 2024 – Drainage investigation works using multi-way temporary traffic lights. In operation between 9.30am and 3.00pm.
A40 London Road, Gerrards Cross : Friday 19th April 2024 to Tuesday 23th April 2024 – Drainage investigation works using multi-way temporary traffic lights. In operation between 8.00pm and 6.00am.
Traffic Calming Works
London Road, Aston Clinton : Tuesday 2nd April 2024 to Tuesday 20th August 2024 – Traffic calming works using a combination of both two-way and three-way temporary traffic lights. In operation between 8.00am and 5.00pm.
Road Safety Maintenance
Main Road North, Ringshall Road, Main Road South and Dunstable Road, Dagnall : Monday 15th April 2024 to Friday 19th April 2024 – Sign installation as part of the Ivinghoe Freight Scheme using temporary traffic lights. In operation between 9.00am and 3.00pm.
*Source of information : Press release from Buckinghamshire Council.