Highway maintenance work week commencing 26th Mar 2018

A pothole repair crew in action.
Week commencing Monday 26th March 2018 Transport for Buckinghamshire will be carrying out work at the following locations.
The work is weather dependent therefore the dates shown are subject to change at short notice.
Carriageway Surfacing Schemes
Lower Road, Gerrards Cross – Kingsway to Mill Lane : Monday 26th March 2018 to Tuesday 27th March 2018 – Plane and patch works taking place using a daytime road closure between 7.00am and 7.00pm.
Stratford Road, Leckhampstead – Leckhampstead Wharf Lane to Ouse Valley Way : Monday 26th March 2018 to Tuesday 27th March 2018 – Plane and patch works taking place using a night-time road closure between 7.00pm and 6.00am.
Penn Street, Penn – A404 to Horsemoor Lane : Monday 26th March 2018 to Tuesday 27th March 2018 – Surface dressing prep works taking place using a daytime road closure between 7.00am and 6.00pm.
Hunts Hill Lane, Naphill – Whole length of road : Monday 26th March 2018 – Conventional resurfacing works taking place using a daytime road closure between 7.00am and 6.00pm.
Kiln Lane, Lacey Green – From Main Road to the last house : Tuesday 27th March 2018 to Wednesday 28th March 2018 – Conventional resurfacing works taking place using a daytime road closure between 7.00am and 6.00pm.
Marsh Road, Kimblewick – Whole length of road : Thursday 29th March 2018 to Wednesday 4th April 2018 – Conventional resurfacing works taking place using a daytime road closure between 7.00am and 6.00pm.
Greenway, Chesham – Whole length of road : Monday 26th March 2018 to Wednesday 28th March 2018 – Carriageway joint sealing works taking place under a daytime road closure between 9.30am and 3.30pm.
Marlow Road, Little Marlow – Sheepridge Lane to Winchbottom Lane : Thursday 29th March 2018 – Carriageway joint sealing works taking place under a daytime road closure between 9.30am and 3.30pm.
Valley Road, Hughenden – Cryers Lane to Coates Lane : Monday 26th March 2018 to Wednesday 28th March 2018 – Solar road studs Installation taking place using a night-time road closure between 7.00pm and 6.00am.