Web Analytics

Roadworks in Buckinghamshire for the week ahead – Monday 8th April 2024

| April 6, 2024

Week commencing Monday 8th April 2024 roadworks are scheduled to take place at the following locations in Buckinghamshire.

The works are part of a rolling programme. As some activities are weather dependent the dates may change at short notice.

Conventional Surfacing Works

Tylers Hill Road, Botley : Monday 8th April 2024 to Wednesday 10th April 2024 – Conventional resurfacing works using a road closure. In operation between 8.00am and 5.00pm.

Footways Resurfacing Works

Church Road, Penn : Monday 4th March 2024 to Friday 12th April 2024 – Footway resurfacing works using a footway closure and temporary traffic lights. In operation between 7.00am and 7.00pm.

Surface Dressing Preparation Works

Lower Icknield Way, Bledlow : Monday 8th April 2024 to Friday 12th April 2024 – Surface dressing patching works using a road closure. In operation between 8.00pm and 6.00am.

Ibstone Road, Stokenchurch : Monday 8th April 2024 to Thursday 11th April 2024 – Surface dressing patching works using a road closure. In operation between 8.00am and 5.00pm.

Dudley Lane, Skirmett : Monday 8th April 2024 to Friday 12th April 2024 – Surface dressing patching works using a road closure. In operation between 9.30am and 3.30pm.

Hitcham Lane, Burnham : Friday 12th April 2024 – Surface dressing patching works using a road closure. In operation between 9.30am and 3.30pm.

Micro-Surfacing Preparation Works

Woodside Close, Amersham : Thursday 4th April 2024 to Monday 8th April 2024 – Micro-surfacing preparation works using a road closure. In operation between 9.30am and 5.00pm.

Street Lighting Works

Buckinghamshire – Various Locations : Upgrade of LED lanterns.
Buckinghamshire – Various Locations : Upgrade of illuminated signs and bollards (located on central traffic islands and roundabouts).
Buckinghamshire – Various Locations : Upgrade of damaged street lighting columns and removal or damaged stumps.
Buckinghamshire – Belisha Beacons – Various Locations : Upgrade, improvement and re-instatement of beacons, lanterns and posts.
Buckinghamshire – School Wig Wag Units – Various Locations : Upgrade of existing flashing units to Bluetooth technology enabled and corrections / reinstatements to advanced warning signs.

Drainage Works

Bishopstone, Bishopstone : Monday 8th April 2024 to Friday 12th April 2024 – Drainage ditch clearance for the first 3 days, then completion of carriageway surfacing works for the last two days which were suspended due to the road flooding. Works to be carried out between 8.30am and 5.30pm using a road closure.

Bois Moor Road, Chesham Bois : Monday 4th March 2024 to Tuesday 23rd April 2024 – Drainage repair works using multi-way temporary traffic lights in operation between 9.30am 3.30pm.

Marlow Road, Cadmore End : Wednesday 27th March 2024 to Friday 19th April 2024 – Drainage repair works using 24 / 7 temporary traffic lights. In operation between 8.00am and 5.00pm.

Road Safety Maintenance Works

Friarage Road, Aylesbury : Monday 25th March 2024 to Friday 12th April 2024 – Road safety maintenance works including targeted patching works, high friction surfacing and lining works using a road closure. In operation between 10.30pm and 6.00am.

Cressex Road, High Wycombe : Tuesday 2nd April 2024 to Saturday 13th April 2024 – Road safety maintenance works including installation of raised tables, high friction surfacing, minor drainage works and lining works using a road closure. In operation 24 / 7 (including weekends).

Traffic Calming Works

London Road, Aston Clinton : Tuesday 2nd April 2024 to Tuesday 20th August 2024 – Traffic calming works using a combination of both two-way and three-way temporary traffic lights. In operation between 8.00am and 5.00pm.

*Source of information : Press release from Buckinghamshire Council.

Comments are closed.